APD’s engineers specialise in the design and commissioning of wind farms with collector systems that minimize electrical losses while performing reliably and safely. From the wind turbine foundation to the utility tie-in point, and supported by our significant experience in HV substations and earthing,
CLIENT: Potentia Energy AI Wind Turbine Inspection – Redefining Asset Intelligence At the Flat Rocks Wind Farm, located approximately 30 km south-west of Kojonup, WA, APD Global, on behalf of Potentia Energy, deployed its autonomous, AI-powered drone inspection system – a breakthrough in turbine asset management and site intelligence. Unlike traditional methods that rely on…
APD Global provided Detailed Design and Foundation Assessment for the Gullen Range Wind Farm.
Prepare and verify a DIgSILENT PowerFactory dynamic model representing the 80MW Emu Downs site consisting of 48 Vestas Wind Turbine Generators (WTG), substation and interconnection to the 132kV grid.