Skip to content
+61 1300 273 797 (AU)+64 0800 273 797 (NZ)EMAIL APD GLOBALSYDNEY | MELBOURNE | BRISBANE | ADELAIDE | PERTH | NEWCASTLE | TOWNSVILLE | DARWIN | HOBART | AUCKLAND | WELLINGTON
Linkedin page opens in new windowYouTube page opens in new window
APD Global
APD Global: 20+ Years Experience – Specialists in Utility Engineering
APD GlobalAPD Global
  • Home
  • About
    • About APD Global
    • Our Clients
    • Privacy Policy
  • Services
    • Contestable Design (ASP3, PM2, 47.X)
    • HV and LV Power Line and Cable Design
    • HV Substation Design
    • Earthing Design
    • EPC / EPCM
    • Renewable Energy
    • Power Generation
    • Power Systems Analysis & Connection Studies
    • Feasibility Studies
    • Testing & Commissioning
    • Land Development & Subdivisions
    • Lighting Design
    • Protection, Automation & Control Systems Engineering
    • Electrical & Instrumentation
    • Telecommunications
    • Civil & Structural
    • National Broadband Network (nbn)
  • Projects
  • News
    • Expressions of Interest – APD Graduate Intake 2024
  • Careers
  • Enquiries
Search:
  • Home
  • About
    • About APD Global
    • Our Clients
    • Privacy Policy
  • Services
    • Contestable Design (ASP3, PM2, 47.X)
    • HV and LV Power Line and Cable Design
    • HV Substation Design
    • Earthing Design
    • EPC / EPCM
    • Renewable Energy
    • Power Generation
    • Power Systems Analysis & Connection Studies
    • Feasibility Studies
    • Testing & Commissioning
    • Land Development & Subdivisions
    • Lighting Design
    • Protection, Automation & Control Systems Engineering
    • Electrical & Instrumentation
    • Telecommunications
    • Civil & Structural
    • National Broadband Network (nbn)
  • Projects
  • News
    • Expressions of Interest – APD Graduate Intake 2024
  • Careers
  • Enquiries

Tag Archives: asset

You are here:
  1. Home
  2. Entries tagged with "asset"

TOM PRICE POWER LINE UNDERGROUNDING

Civil and Structural, Earthing, Power Line DesignBy Remi Harasz07/08/2017

APD were engaged by Rio Tinto requiring 3 sections of overhead power lines to be undergrounded to allow for new haul roads to be constructed. After field data collection, we completed the power line modelling to AS7000 and Rio Tinto’s specifications for new and existing poles and towers. APD also provided detailed designs for structures, foundations, line profiles, earthing and more.

2024 - APD Global. All rights reserved.
  • HOME
  • ABOUT
  • SERVICES
  • PROJECTS
  • NEWS
  • CAREERS
  • ENQUIRIES
Footer
Go to Top