TRANSGRID BERRYBANK WIND FARM SUBSTATION AND SWITCHING STATION AUTOMATION
Deprecated: preg_split(): Passing null to parameter #2 ($subject) of type string is deprecated in /home/apdgloba/public_html/wp-includes/formatting.php on line 3479
APD was engaged by TransGrid to provide the automation configuration, testing & commissioning support works for the greenfield Berrybank wind farm connection substation (BBW) and switching station (BBS). Berrybank 1 wind farm is located in south-western Victoria, approximately 130km west of Melbourne. It is based on 43 Vestas V136-4.2MW wind turbines, with a total installed…