APD has the capability to deliver all of the required components that are essential to the best and correct integration of large scale wind and solar renewable energy power stations.

WOODSIDE PLUTO SOLAR IMPORT PROJECT STUDY


Deprecated: preg_split(): Passing null to parameter #2 ($subject) of type string is deprecated in /home/apdgloba/public_html/wp-includes/formatting.php on line 3479

The Pluto Solar Import Project will incorporate a 50 MW Solar Farm at Maitland Strategic Industrial Estate (Maitland), a Transmission and Distribution system from the Solar Farm to the Pluto LNG Park and the additions and modifications at the Pluto site to allow the import of external power into the auxiliary power grid, displacing some…

EAST ROCKINGHAM WASTE TO ENERGY GENERATOR GRID CONNECTION

The 28.6 MW Waste to Energy plant is situated in East Rockingham, WA and is designed to deliver a cost-effective waste treatment solution and source of dispatchable renewable energy, whilst achieving a 96% diversion of residual waste from landfill. It connects to the grid via Western Power’s Office Rd 132kV (OFE) substation, a greenfield substation…

CHICHESTER SOLAR FARM OWNER’S ENGINEER


Deprecated: preg_split(): Passing null to parameter #2 ($subject) of type string is deprecated in /home/apdgloba/public_html/wp-includes/formatting.php on line 3479

APD Global were engaged by Alinta Energy to provide Owner’s Engineering services for the Chichester Solar Farm. The Chichester Solar Project consisted of a 60MW solar PV power station located in the Pilbara region. The project also included 64km of 220kV transmission line, two new 220kV substations at Christmas Creek and Cloudbreak and an expansion…