For renewable energy projects to be delivered successfully it depends on more than just the generation technology chosen and the MV Collector design. APD has the capability to deliver all of the required components that are essential to the best and correct integration of large scale wind and solar energy power stations.
CLIENT: Potentia Energy AI Wind Turbine Inspection – Redefining Asset Intelligence At the Flat Rocks Wind Farm, located approximately 30 km south-west of Kojonup, WA, APD Global, on behalf of Potentia Energy, deployed its autonomous, AI-powered drone inspection system – a breakthrough in turbine asset management and site intelligence. Unlike traditional methods that rely on…
CLIENT: ACEREZ, EnergyCo Australia’s First REZ APD Global delivered Tender Design services for Australia’s first Renewable Energy Zone (REZ), a landmark project unlocking 4.5GW of clean energy. APD’S project scope spanned across the following areas: Power System Studies: Development of network model, NEM studies, centralised system strength solution and technical advisory services for ACEREZ, EnergyCo,…
CLIENT: Transgrid, EnergyCo Biggest Battery In The Southern Hemisphere APD Global’s Role in SIPS Control APD were appointed as the Independent Engineer for Primary, Secondary and Automation. The role spanned across all design reports, drawings, test & commissioning plans, site visits and live witnessing of tests, as well as SIPS Logic Review and Design. Laboratory…
CLIENT: UGL APD Global provided the control system integration design, configuration, testing & commissioning support works for the project. WORKS UNDERTAKEN INCLUDED: Control system integration design for new & existing control system panels; Configuration of new Allen-Bradley RTU for 33kV BESS switchroom, modification of the existing 66kV RTU & integration of the vendorsupplied BESS system;…
CLIENT: Enerven, Transgrid APD Global completed Stage 1 & Stage 2 design for the BESS Substation & existing Eraring Power Station (EPS) Switchyard for Transgrid (TNSP) complaint with all relevant Australian Standards & requirements of TNSP, AEMO & Origin – including NER & network operating guidelines. APD GLOBAL DESIGNED: Two 330kV single circuit Transmission…
CLIENT: Western Power LOCATION: East Rockingham, WA. SCOPE: To provide automation configuration, testing & commissioning works at the Office Rd connection substation & remote ends of the MSR-WMC81 line cut-in (i.e., the Mason Rd & Western Mining Corporation substations) for the East Rockingham Waste to Energy grid connection. TECHNICAL SITUATION The 28.6 MW Waste to…
APD Global was engaged by CSI for the detailed design, development, testing, SCADA commissioning & integration into the SAPN network of the Mannum Solar Farm – Stage 1.
APD Global was requested by Energy Made Clean to complete a HV submission to satisfy the Western Australian electrical requirements for the Northam solar farm.