Power line design engineering is one of APD’s core businesses offering clients in the utilities, mining, oil and gas sectors low to high voltage networks (415v – 330kv), overhead and underground installations, lattice tower and mono pole structures.
CLIENT: Power and Water Corporation The NT Government established a 10-year strategic plan to enhance infrastructure & development across remote communities, with a strong focus on establishing a comprehensive electrical distribution model. It will enable Power and Water Corporation (PWC) to better understand the existing network capacity at each community. PWC engaged APD to assist…
CLIENT: Western Power Engaged by Western Power to provide the Detail Design for two 330kV and three 132kV terminals at five strategic locations. Works undertaken by APD also included Zone substations modification and integration as well as 12 packages of 132kV and 330kV transmission line design works, together with the design of the communication facilities.…
APD Global was engaged by Energy Australia (EA) to carry out a grid connection study to assess the local network & determine what upgrades were required to allow connection of a further 300-450MW extra generation to the Endeavour Energy’s (EE) 132kV Tallawarra Switching Station.
APD has been engaged to provide full electrical engineering, project management and as built detailing for the Forster Rd, Mt Waverley HV line relocation between Ferntree Gully Rd. and Waverley Rd.
APD were selected as the successful electrical consultant to deliver complete designs and project management of the electrical and communications infrastructure for The Dunes Estate land development.
Provision of electrical design as per AS/NZS 3000, AS/NZS 1158 lighting design and nbn third-party pit & pipe design for the Southlink Cockburn commercial development.
APD Global was engaged to undertake Insulation Coordination and Reactor Switching Studies for a 275kV substation in South Australia. Advanced studies based on PSCAD/EMTDC modelling were carried out to ensure the safe operation of the substation through surge protective devices.
APD were engaged by Essential Energy to complete large packages of reinforcement works as part of their network maintenance. This included both overhead and underground design packages all over NSW.