ALINTA LINE RECONFIGURATION SECONDARY SCOPE
Secondary scope to facilitate reconfiguration of 66kV transmission lines connecting to the Alinta Power Station on the BHP network, including Line protection relay upgrades.
Power line design engineering is one of APD’s core businesses offering clients in the utilities, mining, oil and gas sectors low to high voltage networks (415v – 330kv), overhead and underground installations, lattice tower and mono pole structures.
Secondary scope to facilitate reconfiguration of 66kV transmission lines connecting to the Alinta Power Station on the BHP network, including Line protection relay upgrades.
APD has been engaged to provide full electrical engineering, project management and as built detailing for the Canterbury Road Braeside industrial Estate.
Power line modelling and Design for the 66kv reconfiguration outside of Yarnima Substation.
APD Global were contracted by PLP to engineer and design three new 1.5MVA and one 1MVA 11/0.433kV kiosk substations, powerline modifications and power and fibre optic cable reticulation for the Rio Tinto Wickham Accommodation Expansion.
Field Survey, Tower Design and Pole Design.
Provision of electrical distribution and street lighting design, nbn pit & pipe design services and construction assistance for 2 stage residential development.
Provision of electrical distribution and transmission design, street lighting design and NBN pit & pipe design services, for mixed commercial and residential multi-stage development.
Engineering, Procurement and Construction Management (EPCM).
Powerline Design, Power System Studies & cable/conductor selection, Protection Grading, Earthing Design & Site Testing.
Field Survey of more than 1,000 Energex Distribution Poles, 780 MDUs, 100 Private Poles, Design as per Energex Standards.