Home · Projects · HumeLink

HumeLink East and West.

500 kV. Both sides of the line. Tender-stage design with Acciona. Detail design with UGL. Transgrid’s nation-critical link between Snowy 2.0 and the Sydney load.

AssetHumeLink East and HumeLink West - 500 kV double-circuit
OwnerTransgrid
TenderDesign with Acciona
DetailDesign with UGL - alpine VTM strain towers to 74.2 m and 150 tonnes

HumeLink is the 500 kV backbone that lets Snowy 2.0 actually reach the people who use the power. East runs toward Bannaby. West runs through the alpine country. APD designed both.

The tender pack was with Acciona. The issued-for-construction work is with UGL - structural, civil and conductor packages for the heavy tension and terminal towers, including the VTM family used on HumeLink West.

That is the scope. Not the whole corridor. Not the contractor story. The towers, on both sides.

HumeLink 500 kV VTM towers

HumeLink West

500 kV VTL prototype assembly.

Prototype assembly of the 500 kV VTL medium-tension tower in China for HumeLink West - tower detailing and assembly with UGL and Transgrid.

HumeLink West 500 kV VTL tower prototype assembly
Prototype assembly
HumeLink West 500 kV lattice sections
Lattice sections
HumeLink West tower member marking
Member marking

Transgrid on construction: nation-critical HumeLink underway. East and West in the field: pv magazine Australia.