HumeLink 500 kV. East and West.

500 kV. Both sides of the line. Tender-stage design with Acciona on HumeLink East. Detail design with UGL on HumeLink West - the alpine section. Transgrid’s nation-critical link between Snowy 2.0 and the Sydney load.

AssetHumeLink East and HumeLink West - 500 kV double-circuit
OwnerTransgrid
TenderDesign with Acciona - HumeLink East (Bannaby–Wondalga, awarded to the Acciona–GenusPlus JV)
DetailDesign with UGL - HumeLink West (Wagga Wagga–Maragle, UGL–CPB JV) - alpine VTM strain towers to 74.2 m and 150 tonnes

HumeLink is Transgrid's 500 kV backbone - the transmission link that lets Snowy 2.0 actually reach the people who use the power. East runs toward Bannaby. West runs through the alpine country. APD designed both.

The tender pack was with Acciona. The issued-for-construction 500 kV transmission design is with UGL - structural, civil and conductor packages for the heavy tension and terminal towers, including the VTM family used on HumeLink West.

That is the scope. Not the whole corridor. Not the contractor story. The towers, on both sides.

3D structural model of a HumeLink 500 kV lattice transmission tower

HumeLink West

500 kV VTL prototype assembly.

Prototype assembly of the 500 kV VTL medium-tension tower in China for HumeLink West - tower detailing and assembly with UGL and Transgrid.

HumeLink West 500 kV VTL tower prototype assembly
Prototype assembly
HumeLink West 500 kV lattice sections
Lattice sections
HumeLink West tower member marking
Member marking

Transgrid on construction: nation-critical HumeLink underway. East and West in the field: pv magazine Australia.