Selected work - 15,000+ projects.

Renewable energy studies, grid connection studies, 500 kV substations and transmission tower design, GIS substations and BESS connections. Established in 1999 - 27 years as a safe pair of hands.

Waratah Super Battery

Battery · Independent engineer · NSW

Waratah Super Battery

EnergyCo / Transgrid. Independent engineer on Australia’s largest grid-scale battery - SIPS, primary, secondary and automation.

Case study →
Eraring BESS grid connection

BESS · 330 kV · NSW

Eraring BESS grid connection

Enerven / Transgrid. Primary and secondary design for the BESS substation and the 330 kV tie into Eraring. On Australia’s largest power-station site.

Case study →
Central West Orana REZ

REZ · NEM studies · NSW

Central West Orana REZ

ACEREZ / EnergyCo. Tender design for EnergyCo’s first large-scale Renewable Energy Zone - power system studies, 500 kV and 330 kV transmission, and 500 kV and 330 kV substations unlocking 3 GW.

Case study →
HumeLink 500 kV VTM towers

500 kV · Civil / structural · NSW

HumeLink East and West

Transgrid. Tender-stage design with Acciona. Detail design with UGL - alpine VTM strain towers to 74.2 m and 150 tonnes. Both sides of the 500 kV line.

Case study →
CopperString 500 kV tower design

500 kV · Tower design · QLD

CopperString tower design

500 kV suspension tower D5S2BI and light tension tower D5T15BI on the line that will join Mount Isa to the National Electricity Market.

Case study →
Jerrabomberra 132 kV GIS

GIS · 132 kV · NSW

Jerrabomberra Zone Substation

Essential Energy. Greenfield GIS zone substation - building, plant, VR/AR design reviews, full multidisciplinary delivery from concept to construction.

Case study →
Bunning Lake 132 kV GIS scale model

GIS · 132 kV · WA

Bunning Lake 132 kV GIS

Western Power. New GIS substation plus secondary at Sutherland Street - designed as a digital twin, then rebuilt as a physical scale model. The film is on the page.

The film →
WA Clean Energy Link North

330 kV · Transmission · WA

WA Clean Energy Link - North

Western Power. Detail design for two 330 kV and three 132 kV terminals, twelve line packages, protection and communications - one of WA's defining transmission augmentations.

Port Hedland BESS

BESS · 35 MW · WA

Port Hedland 35 MW BESS

Complete detailed design for the Port Hedland battery energy storage system - primary, secondary, protection and full grid connection documentation.

Woodside Pluto LNG facility

Studies · NWIS · Pilbara

Woodside Pluto NWIS

Woodside Energy. Connection studies, protection and model validation so an islanded LNG plant can take solar and battery power from the North West Interconnected System.

Case study →
Flat Rocks AI turbine inspection

AI · Wind · WA

Flat Rocks AI turbine inspection

Potentia Energy. Autonomous AI drone inspection of wind turbines - delivering asset intelligence at scale instead of rope access as the default.

OneWeb LEO satellite backhaul

Telecoms · LEO · Regional WA

OneWeb LEO satellite backhaul

Eutelsat OneWeb / Telstra. Australia's first LEO satellite backhaul migration site - design, SAED, SMR, test and commission at Coalseam Campground, regional Western Australia.

The film →
5G small cells in Western Australia

Telecoms · 5G · WA

5G small cells

SAED and site make-ready on Western Australian 5G upgrade programmes. The film is a leadership safety walk on a small-cells job.

The film →
SKA-Low in the Murchison

Studies · Radio astronomy · WA

SKA-Low

Power studies, protection and earthing for the Murchison Radio-astronomy Observatory - terrestrial plant under a space instrument.

The film →
Digital Radio Uplift Stage 2

Telecoms · Emergency services · VIC

Digital Radio Uplift Stage 2

Telstra. 252 Victorian sites migrated from analogue to the digital Regional Managed Radio Network - design, construct, install and test across the state.

The film →
Forrestfield–Airport Link telecom racks

Telecoms · Rail · WA

Forrestfield–Airport Link

Nokia / Public Transport Authority. Eleven telecom racks, pre-dressed in the warehouse, then delivered into the cross-passage tunnel.

Case study →
WA-first 4G signalling cabinets

Telecoms · 4G signalling · WA

WA-first 4G signalling

Nokia / Public Transport Authority. More than 80 LTE / 4.9G radio sites across railway tracks and tunnels - Western Australia’s first 4G signalling system.

Case study →
Transpower New Zealand

Transmission · New Zealand

Transpower Lines Full Design Panel

Appointed to Transpower's Lines Full Design Panel - transmission design for New Zealand's national grid, from the same team that serves Transgrid and Western Power.

The story →
Remote communities power stations

Generation · Remote · WA

Remote communities power stations

Single-line diagram and protection design for power stations serving remote communities in Western Australia - reliable power where the grid does not reach.

Glenellen and Carwarp solar farms

Studies · AEMO · NEM

Glenellen and Carwarp

200 MW and 150 MW. Connection studies, market registration and grid integration for Global Power Generation Australia, Recurrent Energy and Gransolar Group.

The studies →
Generator Performance Standard on the SWIS

GPS · AEMO · WA

SWIS refinery GPS

Generator Performance Standard registered with AEMO for a fifty-year-old alumina plant on Western Power’s SWIS - site testing, models and full compliance.

The story →