Waratah Super Battery
EnergyCo / Transgrid. Independent engineer on Australia’s largest grid-scale battery - SIPS, primary, secondary and automation.
Case study →Home · Projects
Renewable energy studies, grid connection studies, 500 kV substations and transmission tower design, GIS substations and BESS connections. Established in 1999 - 27 years as a safe pair of hands.
EnergyCo / Transgrid. Independent engineer on Australia’s largest grid-scale battery - SIPS, primary, secondary and automation.
Case study →
Enerven / Transgrid. Primary and secondary design for the BESS substation and the 330 kV tie into Eraring. On Australia’s largest power-station site.
Case study →
ACEREZ / EnergyCo. Tender design for EnergyCo’s first large-scale Renewable Energy Zone - power system studies, 500 kV and 330 kV transmission, and 500 kV and 330 kV substations unlocking 3 GW.
Case study →
Transgrid. Tender-stage design with Acciona. Detail design with UGL - alpine VTM strain towers to 74.2 m and 150 tonnes. Both sides of the 500 kV line.
Case study →
500 kV suspension tower D5S2BI and light tension tower D5T15BI on the line that will join Mount Isa to the National Electricity Market.
Case study →
Essential Energy. Greenfield GIS zone substation - building, plant, VR/AR design reviews, full multidisciplinary delivery from concept to construction.
Case study →
Western Power. New GIS substation plus secondary at Sutherland Street - designed as a digital twin, then rebuilt as a physical scale model. The film is on the page.
The film →
Western Power. Detail design for two 330 kV and three 132 kV terminals, twelve line packages, protection and communications - one of WA's defining transmission augmentations.
Complete detailed design for the Port Hedland battery energy storage system - primary, secondary, protection and full grid connection documentation.
Woodside Energy. Connection studies, protection and model validation so an islanded LNG plant can take solar and battery power from the North West Interconnected System.
Case study →
Potentia Energy. Autonomous AI drone inspection of wind turbines - delivering asset intelligence at scale instead of rope access as the default.
Eutelsat OneWeb / Telstra. Australia's first LEO satellite backhaul migration site - design, SAED, SMR, test and commission at Coalseam Campground, regional Western Australia.
The film →SAED and site make-ready on Western Australian 5G upgrade programmes. The film is a leadership safety walk on a small-cells job.
The film →Power studies, protection and earthing for the Murchison Radio-astronomy Observatory - terrestrial plant under a space instrument.
The film →
Telstra. 252 Victorian sites migrated from analogue to the digital Regional Managed Radio Network - design, construct, install and test across the state.
The film →
Nokia / Public Transport Authority. Eleven telecom racks, pre-dressed in the warehouse, then delivered into the cross-passage tunnel.
Case study →
Nokia / Public Transport Authority. More than 80 LTE / 4.9G radio sites across railway tracks and tunnels - Western Australia’s first 4G signalling system.
Case study →
Appointed to Transpower's Lines Full Design Panel - transmission design for New Zealand's national grid, from the same team that serves Transgrid and Western Power.
The story →
Single-line diagram and protection design for power stations serving remote communities in Western Australia - reliable power where the grid does not reach.
200 MW and 150 MW. Connection studies, market registration and grid integration for Global Power Generation Australia, Recurrent Energy and Gransolar Group.
The studies →
Generator Performance Standard registered with AEMO for a fifty-year-old alumina plant on Western Power’s SWIS - site testing, models and full compliance.
The story →