MT WHALEBACK SUBSTATION PLANT REPLACEMENT
66kV Mt Whaleback Substation Plant Replacement.
66kV Mt Whaleback Substation Plant Replacement.
Provision of electrical design as per AS/NZS 3000, AS/NZS 1158 lighting design and nbn third-party pit & pipe design for the Southlink Cockburn commercial development.
APD Global was engaged by BHP Iron Ore to provide HV Testing, Commissioning, Engineering Support & Design Revisions for their Jimblebar Mine Expansion.
Provide network and power station capacity upgrades to remote aboriginal communities.
APD Global was engaged to provide a SCADA Definition Phase Study for BHP’s Yandi and Junction substations – critical NPI HV assets
APD Global was engaged to undertake Insulation Coordination and Reactor Switching Studies for a 275kV substation in South Australia. Advanced studies based on PSCAD/EMTDC modelling were carried out to ensure the safe operation of the substation through surge protective devices.
33kV Junction Capacitor circuit breaker, CT and controller replacement.
APD were engaged by Western Power to complete detailed design & drafting for the new transformer circuit & switchroom at the Rangeway substation, Geraldton, WA
APD were engaged by Essential Energy to complete large packages of reinforcement works as part of their network maintenance. This included both overhead and underground design packages all over NSW.
Develop the electrical, SCADA and communications design including layouts, drawings and engineering documents for a new 132/22kV Transformer and Switchroom installation project.
Develop the electrical, SCADA and communications design including layouts, drawings and engineering documents for a new 132/22kV Transformer and Switchroom installation project.
Develop the electrical, SCADA and communications design including layouts, drawings and engineering documents for a new 132/22kV Transformer and Switchroom installation project.
Develop the electrical, SCADA and communications design including layouts, drawings and engineering documents for new 132/22kV Transformer and switchroom project.
Detailed design of communication circuit rearrangement as part of an East Perth disaster recovery process.
Replacement of Ultralink services at several regional WA substations with UHF radio links to existing Western Power sites.
Secondary scope to facilitate reconfiguration of 66kV transmission lines connecting to the Alinta Power Station on the BHP network, including Line protection relay upgrades.
APD has been engaged to provide full electrical engineering, project management and as built detailing for the Canterbury Road Braeside industrial Estate.
APD were engaged by Sydney Trains construction contractor, an Accredited Engineering Organisation with earthing expertise, to provide assurance services for the earthing installation of the new Railway Operation Centre.
APD were engaged to provide Lighting Design within the Rosewood subdivision. Ipswich City Council specified all street lighting to be LED type & fully controllable, and for the lights to be owned & maintained by them. The Council employed the Energex Rate 3 tariff which uses the AS3000 rules & Energex specifications.
Power line modelling and Design for the 66kv reconfiguration outside of Yarnima Substation.
APD’s Power System Studies team provided First Quantum Minerals (FQM) with end-to-end services from detailed site survey (data collection), to computer modelling and system analyses. With a model of the mine network, FQM can investigate various contingency events & plan for the most cost-effective network utilization.
APD was engaged by nbn Co. to perform an independent technical review and certification of the nbn power supply installation design drawings in accordance with relevant Standards, Regulations, and Guidelines for acceptance by Western Power. The design drawing precedes the typical power supply installation arrangement for nbn Fibre to the Node/Compact Sealed DSLAM roll-out in Western Australia.
Development of the electrical, SCADA and communications design for the a new 66/11kV Substation.
APD Global were contracted by PLP to engineer and design three new 1.5MVA and one 1MVA 11/0.433kV kiosk substations, powerline modifications and power and fibre optic cable reticulation for the Rio Tinto Wickham Accommodation Expansion.