MINING AREA C GROWTH REACTIVE SUPPORT
Concept design, detailed design for installation of 10MVAR of reactive support for Mining Area C.
Concept design, detailed design for installation of 10MVAR of reactive support for Mining Area C.
Field Survey, Tower Design and Pole Design.
Provision of electrical distribution and street lighting design, nbn pit & pipe design services and construction assistance for 2 stage residential development.
132kV & 66kV Substation Testing & Commissioning (Primary, Secondary & SCADA).
Field Survey and Data Collection of existing underground network.
Field Survey and Data Collection, Ground Clearance Assessment, Scope of Works.
Provision of electrical distribution and transmission design, street lighting design and NBN pit & pipe design services, for mixed commercial and residential multi-stage development.
Injection Testing, Earthing Analysis & Earth Grid Compliance.
Engineering, Procurement and Construction Management (EPCM).
Power Quality Measurement, Reliability Assessment, Flicker, Harmonics & THD, SAIDI & SAIFI.
Powerline Design, Power System Studies & cable/conductor selection, Protection Grading, Earthing Design & Site Testing.
Site data collection, fault analysis, protection coordination study, arc flash shock hazard assessment and onsite training.
Field Survey of more than 1,000 Energex Distribution Poles, 780 MDUs, 100 Private Poles, Design as per Energex Standards.
Provision of Master Planning and HV/LV electrical distribution, lighting and nbn Pit & Pipe design services for large scale multi stage mixed residential and commercial development.
Engineering, Procurement and Construction (EPC).
Assess new / refurbished residential & commercial connections for regularised and non-regularised power networks at remote aboriginal communities.
Engineering, Procurement and Construction (EPC).
Engineering, Procurement and Construction (EPC).
APD was engaged to provide a turnkey solution for High Speed Disturbance Recorders for multiple generator units across Australia.
Protection relay testing and commissioning as well as training support.
Review of the Agricultural Pivot Control System, implementation of the recommended simplification design and construction.
APD was hired to perform detailed design and development in integrating two new potable water tanks and associated equipment into the plant Process Control System (PCS) at Yandi Mine.