UPGRADE OF MC254 OVERLAND CONVEYOR EMERGENCY STOP SYSTEM
APD was hired to perform detailed design and development in integrating the conveyor emergency stop system into the plant Process Control System (PCS) at BHP Mine Area C.
APD was hired to perform detailed design and development in integrating the conveyor emergency stop system into the plant Process Control System (PCS) at BHP Mine Area C.
Protection grading assessment, Arc flash hazard investigation, and Risk mitigation measures.
Power System Studies, Protection Grading Analysis, Earthing System Design & Site Testing.
Site Inspection, Earthing Design & Drawings, EPR Hazard Assessment on 3rd Party Assets, Current Injection Testing.
Field Survey, Line Assessment Tower Design & Pole Design.
Design 3 sections of cable undergrounding for new haul road crossings.
APD was hired to perform detailed design and Process Control System (PCS) integration for a Variable Speed Drive (VSD) replacement of two vent fan soft starters at Wheelara and OB18.
Engineering, Procurement, Construction and Management (EPCM)
Soil testing, detailed EPR/LFI study, earthing design and injection testing.
Earthing Design & EPR Assessment and Step & Touch Measurement.
APD Global provided Detailed Design and Foundation Assessment for the Gullen Range Wind Farm.
Soil Testing, Earthing Design, Conductor Sizing, Step & Touch Assessment, Earth Injection Testing.
Prepare and verify a DIgSILENT PowerFactory dynamic model representing the 80MW Emu Downs site consisting of 48 Vestas Wind Turbine Generators (WTG), substation and interconnection to the 132kV grid.
Assess the power network infrastructure for new Aboriginal and Government Regional Officer Housing connections for regulated and non-regulated communities as part of the 2012-14 Housing Program.
To provide distribution design services for relocation of Western Power Overhead and Underground High Voltage (22kV) and Low Voltage infrastructure along a 4.2km section of Great Eastern Highway.
Provision of electrical engineering design and field services for large scale commercial development.
Provision of distribution design, lighting design, detailed earthing assessments and subsurface location services for the retrospective undergrounding of Western Power overhead lines in the Town of Claremont. Part of the WA State Undergrounding Power Project (SUPP).
Complete design, procurement, testing and construction management for the replacement of an existing 6.6kV Switchboard. Existing switchboard was split into separate boards with a total of 25 panels. All works were carried out within a brownfield powerstation environment with limits on outages and construction schedules.
Develop the primary, civil,structural and secondary, SCADA and Communications design for a new transformer and switchboard, new switchroom at Wedgefield Substation.
APD was hired to perform detailed design and commissioning for the replacement of 66 kV Oil Circuit Breakers (OCB’s) at 5 different substations around Newman.