APD Global delivered eleven telecom racks into the cross-passage tunnel on the Forrestfield–Airport Link. The racks were planned and pre-dressed at the warehouse so the night possession could be used for install, not assembly.
The design had to fit live tunnel constraints and a fixed delivery window. Working with Nokia and the Public Transport Authority, the agreed deadline was met. A special train ran at 1:50 am and stopped in the tunnels to place the rack infrastructure.
What APD Global delivered
- Warehouse pre-dress of all eleven telecom racks
- Design for tunnel and cross-passage constraints
- Night delivery and install into the rail corridor
The wider WA-first 4G signalling programme for the Public Transport Authority sits on its own page.
APD Global - Forrestfield–Airport Link project record.